banner
Home > Projects > Road and Parement > Construction of bypass roads of Kerend and Sarpol e Zahab Kermanshah
Loading the player ...

Construction of bypass roads of Kerend and Sarpol e Zahab Kermanshah

PROJECT

Construction of bypass roads of Kerend and Sarpol-e-Zahab/ Kermanshah

CLIENT

Kermanshah Water & Waste Water Co.

YEAR 

2007

STATUS

Completed

Project Duration

18 Month


PROJECT’S SPECIFICATION

ORIGINAL VOLUME OF  BODY AND PROCEDURE  OF OPERATION


400,000 Cubic meter excavation

60,000 Cubic meter stone excavation

8,400,000 cubic meter-kilometers. Loading and transport of soil and aggregates

70,000 cubic meter of embankment

60,000 cubic meter of   base  or sub  base  mountain material

Preparation and execution of 80,000 tons of asphalt.

For executing of these projects the crushers and sand and salt equipment and  Asphalt production plant with  TPH160 has been prepared.

ORIGINAL VOLUME OF  TECHNICAL BUILDINGS AND BRIDGES:


10,200 cubic meter of stone building.

4700 cubic meter of concrete.

8,600 cubic meter square shuttering.

248 tons Reinforcement.

SAFETY:


3 tons safety signs Construction and 500 tons metal base construction.