CLIENT
|
Kermanshah Water & Waste Water Co.
|
YEAR
|
2007
|
STATUS
|
Completed
|
PROJECT’S SPECIFICATION
ORIGINAL VOLUME OF BODY AND PROCEDURE OF OPERATION
400,000 Cubic meter excavation
60,000 Cubic meter stone excavation
8,400,000 cubic meter-kilometers. Loading and transport of soil and aggregates
70,000 cubic meter of embankment
60,000 cubic meter of base or sub base mountain material
Preparation and execution of 80,000 tons of asphalt.
For executing of these projects the crushers and sand and salt equipment and Asphalt production plant with TPH160 has been prepared.
ORIGINAL VOLUME OF TECHNICAL BUILDINGS AND BRIDGES:
10,200 cubic meter of stone building.
4700 cubic meter of concrete.
8,600 cubic meter square shuttering.
248 tons Reinforcement.
SAFETY:
3 tons safety signs Construction and 500 tons metal base construction.